⚡ Diesel · Gas · Standby · Prime

Generator
Installation &
Maintenance

Industrial and commercial generator sizing, installation, load testing, and automatic transfer switching. Planned maintenance contracts to keep your standby power ready when you need it most.

Diesel & Gas
Standby and prime power
ATS Included
Automatic transfer switching
Planned Contracts
Regular maintenance available

Full Generator Services

In Guyana's environment, a reliable standby generator isn't a luxury — it's a necessity. We handle every aspect of your generator project from initial sizing through to ongoing maintenance.

Sizing

Load Assessment & Sizing

Proper generator sizing is critical. Undersized sets run overloaded; oversized sets wet-stack and fail prematurely. We carry out a full load assessment before recommending a generator rating.

Installation

Generator Installation

Civil base preparation, mechanical installation, fuel system connection, exhaust routing, and full electrical connection to your distribution system. Installation to NEC standards.

ATS

Automatic Transfer Switching

Supply and installation of automatic transfer switches (ATS) for seamless changeover from utility to generator on power failure. Open, closed, and soft transition ATS configurations available.

Load Testing

Load Bank Testing

Resistive and reactive load bank testing to verify generator performance at rated capacity. Essential for new installations and as part of planned maintenance to prevent wet stacking on lightly loaded sets.

Maintenance

Planned Maintenance Contracts

Regular servicing — oil and filter changes, coolant checks, battery condition, exercise running, and full inspection. Scheduled maintenance keeps your standby set reliable for when you need it.

Repair

Generator Repair & Overhaul

Fault diagnosis and repair on generator sets — control system faults, AVR replacement, alternator issues, and engine-related problems. Emergency call-out available for critical power failures.

From Survey to Commissioning

A structured approach ensures your generator installation is right first time.

Site Survey & Load Assessment

Site visit to assess your power requirements, existing electrical infrastructure, physical installation constraints, fuel storage options, and exhaust routing.

Specification & Proposal

Generator set specification, ATS selection, single line diagram, and full installation proposal with fixed pricing. Equipment lead times confirmed before you commit.

Installation

Base preparation, mechanical installation, fuel system, exhaust, and full electrical connection. All work to NEC standards with appropriate protection devices throughout.

Commissioning & Load Test

Full commissioning including no-load and load bank testing at rated capacity. ATS functionality tested through simulated mains failure. All settings documented.

Handover & Maintenance Plan

As-built documentation, operating manual, and maintenance schedule provided. Ongoing planned maintenance contract established to keep your system reliable.

Reliable Power. Properly Installed.

A standby generator that fails when the power goes out is worse than useless. Proper installation, correct sizing, and regular maintenance are what separate a reliable standby system from an expensive ornament.

  • Proper load assessment before sizing — no guesswork
  • NEC-compliant installation with full documentation
  • Load bank testing at commissioning — verified at rated capacity
  • ATS supply and installation for automatic changeover
  • Planned maintenance contracts — residential and commercial
  • Emergency response for critical generator failures
Diesel & Gas
Standby and prime power sets
ATS
Automatic transfer switching
Load Tested
Every installation verified at full load
Maintenance Contracts
Keep your standby power reliable

Generator Services Specification

Summary of the generator types and scope our team handles.

CategoryDetail
Generator typesDiesel, natural gas, LPG — standby and prime rated sets
ApplicationsResidential, commercial, industrial, oil & gas facilities
Power rangeSmall residential (5–20 kVA) to large industrial sets
VoltageSingle phase 120/240V · Three phase 208V / 480V
Transfer switchingManual, open transition ATS, closed transition ATS, soft load transfer
Load bank testingResistive and reactive load bank testing to rated kW/kVA
Fuel systemsDay tank installation, bulk fuel storage, fuel transfer systems
Electrical standardNEC (NFPA 70) · NEC Article 445 Generators · NEC Article 700 Emergency Systems
Maintenance intervalsPer manufacturer schedule — typically 250hr / 500hr / annual

Need a Generator Installed or Serviced?

Contact us for a site survey and proposal. Whether it's a new installation, an ATS upgrade, or a maintenance contract — we can help.